Tour of original look lake front side. Four projects exist on the lake front side: Removal of all weeds, shrubs, ivy, steel, aluminum, and tons of cement. Second project is to dig three forty foot in length by two foot wide and forty-two inches deep trenches. This will house two retaining walls to keep the house from falling any farther down and forward towards the water. Number three is the removal of decking and replacement of deck with drainage behind walls, down the sides of lot. Lastly is to build land to some type of grade less then the ninety degree slope it exists on today. 