Sunday, March 29, 2015

Winter’s wrath over, Spring’s

How do you eat an elephant, one bite at a time!

Humble pie! 

To date, it has been a long cold and miserable winter. January reached -30 it snowed last week of December and the snow just recently melted, bringing thousands of gallons of water pouring into the cottage. Progress has been slow moving, but has still moved somewhat faster then the slow spring start!
After the last two weeks of December it has been a struggle to get the main project completed, and that is the digging out of the kitchen and living room. Needing to dig out crawl space for two reasons. First, being for the furnace trunk, secondly the water that flows from one side of the cottage. The furnace trunk will sit under the joists, and needing drainage spanning length and with of cottage linking outside drainage.

 Below pictures are from January till the end of March. Now hopefully the weather warms enough to melt the frost!

Outlook for the future!









Moved kitchen wall up underneath the I-beam 4ft by 4ft section footings done and blocked on top.
Small issue, as the weather has warmed the dirt has thawed, and the obvious is recognized. The dirt under the 4ft of cement is the reason the original wall rotted. Now the plan is to have a 4ft 3 3/4 inch knee wall, but first I had to chissel the dirt back and quick crete the area for the future floor and wall stability.