Fall Is Officially Here - Progress Again

The cold weather is officially here, but with it is the sunny short days, leaves falling, smell of burning leaves, and Autumn sunsets with colors of leaves in foreground. As much as I hate cold weather, Autumn is beautiful here especially on the lake. It's a great time of year here with football, end of baseball season and beginning of hockey. Well that is all well and good, but even better news is future of this house and just now seeing how close to completion this just over 2 year project is! More exciting is that I am looking at flooring options, cabinets, paint colors, carpets, and so on. I most certainly am hoping to have the inside complete mid-March and prepare for building the deck, and stairs. Then I can stain the house, fix a busted fence and a few small other things. Updated photos below.




Kitchen layout today, probably will change! 
 Re-sided cedar on house below trapezoids. Windows and door are now installed brand new Andersons. Veneer Stone below windows.  

 What a view!

Wednesday, September 14, 2016

Preparing for the Deep Freeze!


Summer is officially over, for such a warm summer not much to talk about! Inside of the house had the rough inspections on HVAC and Plumbing, kitchen is wired (will show jpgs next post) working on the outside siding and miscellaneous other things.  I am looking to have the outside wrapped up by mid to end of October, then back inside, if everything goes well July 1, 2017 should be fun.





 I temporarily put in the dock end of June for jetski, I actually used it this summer also!

 Kitchen
 This was the hottest day of the year!


 New Trapezoid Windows above, now I will have to paint, couldn't afford the Anderson 400s like the rest of the house.
 
 New Anderson 400s right and left side of lake side door.

 Interior view

 Kitchen Layout: Kraft Cabinets Mushroom with coco Glaze




 I decided last minute to re-side the house and added Veneer stone, Labor day weekend












Still siding re-siding lake front side of house,

Tuesday, June 14, 2016

Side Tracked

          I've been side tracked from the cottage for quite some time now, and here is one reason why! My shower leaked into the basement due to the original builder MJC who nailed the shower membrane using finished nails to the subfloor and then poor the shower base. And of course after 15 years water finds its way everywhere. I decided that no need in just replacing the shower so we went with 12 x 24 tiles on floor and walls with glass around the shower and soon the trim base of the wall too. Pics are below. I also ended up helping out St. Vincent De Paul with gutting and replacing a bathroom in Oakland Township and ended up power washing and staining my boss's deck. (More Pics later

                  (Side Note) I have been working with a tiling guy for a few months now and definitely enjoy tiling, however it is not as easy as laying a huge tile on the ground and calling it good. I have over 50 hours in this bathroom, and I am not done yet. Everything in construction has a 3 level process   and the fourth level is to fix what ever you messed up. I never realized the real cost of a complete bathroom but it is fair to say that I saved myself 10k by doing the job myself. Average Master bathroom gutted to complete 15-25k if hiring a contractor. This is by no means a DIY homeowner unless previously experience in some type of construction or very handy.


       So now that I have completed the shower I moved back out to the cottage and worked on completing the lower level outside next to lake with 15 yards of dirt and sod two weeks ago. This past week I put the sub-floor in kitchen and started hooking-up Navein water heater and water softener. Shitter will be put in sometime this week. That makes it about 19 months since I have had any time of plumbing in the house.






Master Bath Floor 12 x 24 tiles
 
Shower with glass tile around
 
Bottom level of land next to lake, top soiled and sodded!
 
 
 
 


 

 
 
Kitchen Sub-Floor
 
How Beautiful it is to walk on a solid floor, I thought I was a gymnast for about a year!

Next up is install toilet!



Thursday, April 14, 2016

Furnace, Plumbing, Electrical and Flooring


Furnace has now been completely installed and passed inspection! I had rough plumbing and partial electrical inspection as well. All passed! We put the floor down 2 weekends ago and WoW what a view. It is nice a nice level floor and the living room looks huge. Next up is kitchen floor, tankless hot water heater, softener and a functioning toilet. This will be the first time in a year that I have had a floor or any sort of plumbing. 

I am still roughing in the electrical should take me about a month; when I actually get time. I am currently tiling my master bath at the other house, and have picked up a couple of small side jobs too!

The kids came out to help as well as my neighbor who is a builder. Thanks for all the help it is finally resembling a house now. This place heats up great and the furnace is 98% efficient. Gas lines have also been put in. Fireplace, stove, furnace, hot water heater, and gas grille. 

On a side note I never spoke of my plumber, but I hired a local guy and paid him hourly to teach me how to rough plumb a house. I had to gut out all of the electrical, plumbing, and gas lines in the home  because nothing worked, or made code. The plumber was a local guy who had been recommended to me by several people and he saved me a ton of money that I would have had to dish out to some crap company/contractor that would end up screwing it up anyway. Well back in February he passed away and I just wanted to mention what a great guy and I know he will be missed by many! I learned so much from him. 











Thursday, February 11, 2016

Furnace Continuation

Furnace is now up and running, just a few more things to piece together before mechanical inspection. Cold air ducts still need to be run in the kitchen, gas lines for stove and fire place, and button up insulation around duct work. All in all not too bad just took longer then expected. 

This was more then just an undertaking, it was more like trying to solve Flint’s water problems in less then 4 months. Well, maybe more like putting a square peg into a round hole. This project started in October and looks to be finish in about two more full working days. Needless to say the house is now at least comfortable enough to work in at 45 degrees. I received my first heat bill and was shocked that is was so low, considering I don’t have a floor on yet. I keep the house at 45 and that will suffice for this year. The last time I had heat was over a year ago. 

Couple things first, I hired a local HVAC professional, and I emphasize professional because I know how worthless most contractors are. I believe most contractors live in Flint because no one can be as much of a moron as two contractors I have dealt with in the past. I am thinking they must all gather their and drink the water, more to come on incompetent contractors, how to hire and find competent people who are not out there to steal from you. I am thankful for a few people locally that have definitely taken care of me and taken the time to show me how to install plumbing and HVAC. Just about every Sunday I work about 10 hrs a day with this local guy installing duct work. I hired this guy to do the work, but I told him that I will do the work and he instructs me on what to do. This has worked out most outstandingly because my education on furnace and duct work is beyond what I could have imagined. Thank you HVAC guy!

I installed a goodman furnace 96% with 6 heat lines in the living room 4 in the upstairs bathroom and two bedrooms, and 2 in the kitchen. All ductwork that is in a crawl space or attic has to be insulated. That was just as hard as installing the duct work under the joists. You can understand from looking at the pictures below on how tight everything is. I would continue to explain more but that would require a couple of pages worth of details. Anyways this type of work is not something a home owner should do without the right expertise, otherwise furnace will not work/breathe correctly. 

Inspection should take place in next two weeks, I am having mechanical and plumbing done at the same time. After that I have to finish up a couple electrical lines in the crawl space, put on the sub floor and start wiring. I hope to have drywall by early to end of May.