Tuesday, November 11, 2014

Project I (Yard and Debris Removal)

     As most who know of the huge undertaking this project has been for the past five months. This was actually very cumbersome at times for me after I actually closed on the place and needed to start planning projects. I choose the outside for obvious reasons and with the current shape it was in and weather inevitably going to play a part, I chose to start dealing with the 90 degree slope leading to the water. I first started with the overgrown trees, roots, poison ivy, poison oak and almost 85 years of debris that was buried, laying anywhere and everywhere. The pictures don't justify just how bad it was, and since I am such a  forward patient and pre-planned thinker, I had not taken the time to thoroughly look at the whole picture. So I dug right in and learned the easiest way that my personality allows; sweat equity. That's why I keep a book of matches and a lot of gasoline at the place! Lighting this place on fire for would be a distinct possibility some people who will view this blog and and have the construction expertise would do. But this is me and when it comes to me I will conquer first ask questions later! This brings me to my final point before I explain PROJECT I. This place has humbled me more then once and I expect it to continue. Lesson 1 take a lot more time before jumping into a piling heap of enfoiré. (watch more you tube videos)  


Project I removal of the enfoiré french word for shit, not sure what else to call it! This blog will take on several themes but I like french fries but they make me enfoiré. So from now on I will use enfoiré to explain a horrendous undertaking in which I was utterly exhausted due to our 90 degree weather showed up last week of July and continued until mid August. Yes three weekends to remove this!

The decks footings are 6 inches above ground and very dangerous to walk on. All of this debris was remove with the following methods, oath, bleach, lighter fluid, gas, and finally.... drum roll a shovel. Everything is manual labor here.  





List of things removed from our beautiful earth. One would think that this was once a  garbage dump. Bushes, trees, tree stumps all ivy, spiders, bees from all 72 countries, beer cans from the 60s, shoes plugging holes in what someone called 3 retaining walls. I will keep going wet wood, aluminum sheets 4 x 8 roughly 50-70 of them 10 snow plows, one highway guard rail-half of it is gone, rubber, roots holding everything together, and last but not least clay tiles which used to be to the septic system. I don't believe I have dug far enough down to remove that. For the most part the area is cleaned up and know needs to be built up. Future pics to come. 

I will use the second to last picture to describe the next up and coming project.. I hired a contractor to build two 40 foot by 4 ft versa-block walls.  Since I didn't have the luxury of actually having experience with this I hired it out but made sure I was their every step of the way, and I still ended up with an enfoiré sandwich. The first part of this project was to dig two 42 inch trenches to set a base for the wall to sit on. This was again not an easy task.
No matter what at the end of the day this place rocks 65 sub-gracious  in October with a bon fire burning in the back. I hope that the enviromentalists out there aren't paying attention. It cost hundreds of dollars to have enfoiré hauled away.  

No comments:

Post a Comment