This is somewhat of a continuation from last weekends post of items started/accomplished. Today’s weather reached 55 degrees today with 15 mph winds. A few big projects were completed this weekend, and thank goodness because the rains start next week and needed to complete the block underneath the new kitchen wall, and we were able to put one full shovel in the ground and remove more dirt. The rest of it is still frozen, couple more weeks before the frost advisory is lifted, and the rest of the house should be completely dug out and down 18 inches by the 2nd weekend of May. Below are more pictures of the progress.
On a side note the contractor (Top Quality Contracting) that has been helping me and teaching along the way, started by in August 2014 with the retaining walls and worked with my for a smaller wage December through now. I laid out each project and had my path forward on all of it, but I am not a master carpenter or a brick and mortar experienced individual. I wouldn’t have been able to accomplish everything (rough carpentry) that had to be done in the kitchen with out some guidance and expertise. The kitchen is now to the point where only a few more minor details need to be accomplished before the last wall and the remainder of the floor is put back down. If you look back on the original kitchen and the gutted kitchen these pics don’t give you the complete idea of how much pain, blood, sweat and my tears this has been. Jason from top quality contracting specializes in cement/masonry, but he is by far a master carpenter. Nothing in this house was level and now everything is eventually getting there. If anyone is looking for an excellent contractor this is the company. Enjoy the pics, next post should be in May.
Kitchen Mechanical Room Addition lots of scrap wood
This part of the addition will be the mechanical room
Kitchen new opening bathroom is far right
Micro lamb was rotted so I replaced it, 20 ton bottle jacks are the newest of my tools this house
has been lifted up and placed down numerous times replacing rotted wood. My next life I will own a house lifting business.
My one oops of the winter, I shut off the well at the main below, but didn’t empty the pump tank and it kinda swelled a little. $600 mistake that is one of a couple, but this one has cost the most.
Kitchen wall addition, move off the dirt floor
3" x 3” Window Opening
Water traveling from street into house out of house to lake front yard
Anderson 400 Window Forest Green one of twelve. Very nice window, great product
Removing various pieces of rotted, broken cedar and replacing it. Tyvec first! Replaced rotted bottom plates along master bedroom and tore out fiber board and replaced with plywood
New Window
My pooch pepper! He loves it out their!
Main beam torn down. Temporary beam lifted with bottle jacks.
Micro lamb beam in last big project in kitchen, hopefully the house. 1000 lb beam took 5 of us to get this up and in. Took over 6 hours to prep this area prior to removing beam. Drew and Hunter’s 6”1 length came in handy.
Level! Third time in a row. Nice
It’s a beautiful thing!
Tough to see but lower right hand corner has a two height cinder block wall. last 3 five inch block will go on this week. Only two more smaller holes to repair, along with foam insulation needed along outside walls.
You can stand outside of the window and see straight through to the lake.
Yes, I have been burning as much shit as I can, a little bit of Kerosene goes a long way!