Kitchen project
The kitchen has been gutted for three reasons, first reason is due to the rotting taking place (water flooded under kitchen floor) around the outside of the kitchen. Second reason follows the first only way repair replace studs and sill plate around the kitchen is to gut the walls down to the studs, and tear up the floor to gain access to the crawl space. Once the walls are completely torn down to the studs the floor and sub floor will be ripped up, crawl space dug down to 48 inches, joists will be replaced in conjunction with the studs and sill plate.
 |
| This is the original kitchen. a 1940s fridge/freezer that smelled like dead bodies were stored, a wall oven that didn’t work along with a stove top island. |
 |
| New insulation, completely new plumbing lines, and electrical system will be run throughout the house. It has been pieced together with different fixes throughout the years. Electrical, not sure how anything works. Furnace system is located upstairs and needs to be moved downstairs, it’s only running at 55% efficient. Water is a well sitting in the utility room, might be moving that under kitchen. This way I can better disperse lines throughout and keep well from freezing up because it is currently located outside. The house no longer has running water/plumbing parts, water heater, or toilets. It is all burning in a pile, better burning then me paying for someone to tow it away. |
 |
| House entrance. Looking to move the door just left of current location so I can install a storm door and have a bigger entrance. Still researching due to having to move electrical service to another location on the house. |
 |
| This room is going to be the new entrance into the house. |
 |
Right now the electric water heater, washer/dryer, and water softener is stored along with a 100 amp panel wired by a Walmart worker.
|
 |
| Non-functioning bathroom, plan for this room is to make it bigger and run new plumbing. This will add another 1/2 bath do the house. As I understand it, it never functioned. |
 |
| Pantry. This will be the where the tankless water heater and furnace will go. This room will be my bathroom 5’x 5' |
 |
| High school kids that work for cheap and love using crowbars and sledge hammers. kitchen was demolished and material put into garbage bags in two 8 hr days. |
 |
| Tore floor up in 4 hours 3 people and began digging |
 |
| Extending the kitchen out for pantry, washer/dryer and furnace room. |
 |
| Yes, that is right galavized steel piece that was off the main line connected the “T” drain to the rest of the house. It was leaking, dripping, seeping, tinkling, and all around creating a shit zone literally in the kitchen. This was one of the primary reason when you walked into the house that it smell like Jimmy Hoffa’s body had been rotting for 30 years. WOW! |
 |
| Didn’t dig out crawl space my desired depth but ended up going 14 inches then placing plastic down, then drains and then pea stone. This leaves 7 inches between stone and joists. |
 |
| LEVEL this was the highlight of the past 60 days. Nothing in this original house was level, not one wall, I checked everywhere for a level, none existed |
 |
| This part of the gut took place in November. |
 |
| One of 6 total piles of wood, cooper, cement and fecal matter soaked into the wood. total 96 yards of debris taken from this house inside and out. I still have the whole upstairs to gut, so the count continues. |
As of December 31, 2014 8:30 pm this is how the kitchen looks. A couple of changes during mid stream, moved the wall separating kitchen and living room 15 1/2 inches and building the corner outside out 6 x 4 making the kitchen 226 square feet. List of objectives left; Header spanning middle of kitchen baring the up stairs, build separating wall, run plumbing drains, finish joists, replace window, and finish flooring for now that I can think of. Project #6 going on and on and on.